A B C Analysis - Stores Accounts

ABC ANALYSYS:-
An ABC method of analysis is the method devised to effect economy in the expenditure of available resources in the purchase of stock with the help of this method it is used to keep a close control on each and every item of stock to be received daily and receipts regulated so that stock are kept low but sufficient enough to meet all demands.  Since such close control on each item is neither possible with the available resources nor it is justified, hence a system of selective central check has been adopted.  This is what the ABC method seeks to do.  Item involving heavy cost are most carefully controlled whereas the items involving little value need little or any control.  A.B.C is therefore a method of selective control by which items whose annual usage value is high, are given maximum attention and stocks kept at low level.  This is achieved in two parts as under:
a) An ABC analysis in which all items in stocks are analyzed and classified according to descending order of their annual usage value.
b) A.B.C. control which consists of determining the extent of attention and control be exercised within the limitation of the existing staff officer’s strength and each of the three categories of items.
Categorization of items (ABC)
1. AA Category: All items having annual usage value of above Rs.5 lakhs.
2. A Category: All items having annual usage value between Rs.50,000 and Rs.5 lakhs in these cases stock should not exceed more than 3 months requirements.
3. B1 Category: All items having annual usage of Rs.25,000 and above but below Rs. 50,000 in these case the stock should not exceed six months requirements.
4. B2 Category: All items having annual usage value of Rs.10,000 and above but below Rs.25,000 in these cases the stock should not exceed six months requirements.
5. C Category: All items having annual usage value of below Rs.10, 000.  In these case the stock not to exceed 12 months requirements.
6. D Category: All items which have not moved more than one or two years.

A review once a year is conducted to see that these categories have been clearly market on ‘P.L.Cards’ and on the ‘stocks in hand file’ to indicate the category to which it belongs i.e. category A, B or C or D.
OBJECT
The object of ABC analysis is to achieve better inventory management i.e. the lower inventory level and higher service efficiency with a saving on the dividend liability due to a reduction in store Balances.  ABC analysis ensures not only low inventory but also reduction in office work.

: Inventory Control: - The ABC analysis in Inventory Control means to analyses various items of stock into 3 categories A, B and C according to their value in descending order, as explained below, with a view to effect economy.
The ABC analysis divides the items into 3 parts.
A Items: - Being those items which involves large amounts of value and must, be controlled as rigidly as possible. (15 lakh above)
B Items: - Being those items which involves moderate value and therefore require careful but not rigid control. (2.25 lakh to 15 lakh)
C Items: - Being those items which involve a little value and therefore, require only minimum amount of control. (C1 Items value 25000/- to 2.25 lakh) and (C2 items up to 25000/-)
value is Red is different from railway to railway. 
In SR for 2017-18      A category is Rs 43 Lakhs and above; B category is between Rs 7 lakhs and Rs 43 lakhs; C category is Rs 7 lakhs and less
The relative position of these categories as been shown as under for total consumption during a period

A-items B-items C-items
Quantity   10% 30% 60%
Value 10% 20% 10%
Checks exercised 3 months  6 months 1 year
between to 6 months to 1 year
The basic principle of ABC method of stock control is economy in expenditure in expenditure of available resources to optimize results. The closet control is that each and every item would be revised daily / periodically as may be prescribed and receipts regulated so that stocks are kept low but yet full compliance of demands is achieved. Since such close control on each item in neither possible with the available resources nor it is justified by the results that can be expected, a system of selective control as to adopted. This is what the ABC method seeks to do, that the items which are costly they are given the maximum attention to reduce wastage and there stock levels are frequently checked keeping in mind the pattern of consumption. Where the items involving less value is given lesser attention. These items are purchased in bulk quantities and consumed over time.

The introduction of ABC analysis system as proved useful in respect of efficient inventory control by the Railway Management by adopting the following step.
1. Codification of all items being held in stock on all India basis using 8 digit Numerical Code adopting semi significant system keeping in view the needs for complete computerization of all operations in Materials Management.
2. Application of the concept of Economic order quantity in purchasing.
3. Variety reduction of the item held in stock.
4. Streamlining of the procedures followed for purchases / disposal etc. With a view to eliminate in fructuous checks and ensure grater decentralization and quick decision making.
5. Expeditious disposal of surplus, obsolete and scrap materials and simplification of procedures thereof.
6. Wider dissemination of information on modern concept of Inventory Management including value analysis amongst all the officers and Staff concerned through lectures, conferences and training courses etc.
7. Enforcing re-order level system of recoupment except for items procured through centralized agencies where annual system of procurement was continued.
8. Adoption of product valuation techniques for examining reasonable of the offer.
9. Mechanization / Computerization of stores accounting and inventory control functions on a predetermined phased basis, starting with inventory accounting and gradually extending to other fields.

Demands Payable

CHEQUES & BILLS RECONCILIATION

1. The cheques drawn statement is prepared by the Accounts officer indicating the cheque number, the bank and the amount of cheques.
2. The total amount of the cheque drawn is reconciled with the amount shown in the General Cash book under cheques & bills.
3. After the encashment of the cheques each bank prepare a debit scroll showing the number and the amount of each cheque.
4. The debit scroll gives the total of cheques encashed for the month and the cumulative total from the 1st of the month.
5. A manuscript register is maintained to record the total amount of cheques issued date wise and bank wise.
6. A comparison of the entries with the debit scroll will indicate the cheques yet to be encashed and also discrepancies and errors.
7. The adjustments are as follows:
a) The amount of cheque issued on a day
Appropriate service head Dr.
Cheques & bills Cr.
b) At the end of the month when the figures of cheques paid are available & reconciled
Cheques & bills Dr.
Deposit Reserve Bank Cr.‬


TWFA - Transfer w/o Financial Adjustment

 TRANSFER WITHOUT FINANCIAL ADJUSTMENTS (TWFA)
1. TWFA means transfer of assets from one Railway of unit to another Railway or unit.
2. No journal entry (JV) is required.
3. No debit is raised or no credit is afforded by the unit or Railway taking over the assets.
4. TWFA is done only through adjusting into the financial books of the two Railways or units by transfer entry.
5. The main object of ‘TWFA’ is to avoid unnecessary adjustments in regular accounts and budgeting.
6. Transfer of assets donot affect the overall position of Railways.
7. The amount of assets as stands in the books of unit or Railway giving away assets is deducted from opening balances and similarly the same amount is added in the opening balances of the unit or Railway taking over assets.


Annexure J Misclassification

ANNEXURE J (MISCLASSIFICATION)
1. It is a statement prepared when an item of misclassification and other important mistakes either detected by Statutory Audit or by Accounts.
2. During the course of accountal in books, when an expenditure or income is wrongly appeared in any other head of account instead proper head of account, the mistake is know as misclassification.
3. During the course of Financial and other review it is checked that whether there is any booking misclassified and if found the same is regulated in same year through Journal Entry.
For example:
a) Booking in HBA instead of Motor Car.
b) Booking in one demand instead of another demand.
c) Booking in Revenue instead of Planhead etc.


EXCHEQUER CONTROL
1. Exchequer control is the mechanism of concurrent regularization of Cash outgo by each disbursing officer against the Cash content of the budget allotment.
2. The object of exchequer control is to establish a system for correct estimation of Cash outgo and to monitor disbursements.
3. It is important tool of Budgetary control.
4. In excise of Exchequer control the total allotments of the year are divided between “Cash” and “Adjustments”.
5. Success of Exchequer control greatly depends upon his distribution.
6. The Railway board issues quarterly Cash allotments to each Railway Administration and Railway Administration issues monthly Cash allotments to each Division/Workshop.
7. Each Railway Administration will report to the Railway board for actual disbursement during the quarter while asking Cash allotment for next quarter.


Types of tenders

1. Open tender system: This is the best means considered so as to secure the best value possible for the money spent as it require calling for the tenderers by public advertisement in the most open and public manned possible.  Advantage of this system is it’s more competitive nature and new firms will come-up.  Its disadvantage is time taking.
2. Limited tender system: where for reasons which should be in the Public interest, it is considered not practicable or advantageous to call for open tenders.  Limited tenders may be invited with the concurrence of FA&CAO and approval of the competent authority.
In openline Railways, the system of inviting tenders for works costing up Rs.40 lakhs each from amongst the contractors borne on the approved list may also be adopted when it is considered advantageous to do so, provided the number of contractors borne on the approved list for the particular type of work is not less than 10.
3. Special limited tenders: These may be invited from specialized and reputed contractors organizations and Agencies.  Tenderers need not necessarily be borne on the approved list.  Tenderers from whom special limited tenders are to be invited should preferably be more than six.
A proposal detailing the circumstances and necessity for going in for special limited tenders should be insisted and got concurred by FA&CAO before personal approval of the PHOD is obtained.
4. Single Tender system: Single tender is invited in cases where the work may be of   
    a complex or complicated type, and where the work should be under taken by a
    particular Firm or concern or without delay.
          This is awarded in the following situations:
i) Emergency situations like accidents, Breaches involving disclosure to traffic.
ii) Works of special nature and any other situation where GM personally considers it inescapable to call for single tender.
iii) Annual maintenance contract for equipment can be placed on single tenders basis on authorized dealers with the approval of additional GM of Railways.
5. Two pocket system of tendering: Here two pocket means two offers (as pockets).  One is a ‘technical offer’ and the other is a ‘commercial offer’.
Two pocket system of tendering may be adopted in specially identified situations for obtaining consultancy services for highly technical works where parameters cannot be precisely pre defined or execution works which are either technically complicated or specialized in nature and which are executed very rarely.