Wednesday, May 2, 2018

Traffic Costing - Assessment of Earnings

Assessment of Earnings
For all classes / Coach Capacity + No of Coaches x No of berths/seats x fare whole distance +reservation charges.
Normal formation of Passenger Trains
2 or 3 GS on either end of the train
13/14 SL coaches(72 berths) ,
1 First AC (one coupe 2 berths and 4 cabins 4 berths each),
             1or 2 II AC(48), 3 or 5 III AC (72) 

Class
No of Berths/Seats
Fare
In Rs
No of coaches
Total
In Rs
2nd Ordinary
72
219
2
31536
3 SL
72
415
12
358560
3 AC
72
1099
3
237384
2 AC
48
1565
2
150240
1 AC
20
2640
1
52800
Total per trip



830520
Total per day(2 trips)



1661040
Total per year



606279600

Assumptions:
  1. That the train runs full capacity
  2. That the fares are full fares no concessions whatsoever
  3. That the formation remains the same
  4. Chennai to Kanyakumari
Earnings Potential
FARE:Superfast Express (12665) train fare is Rs.220 in II class Rs 415 in sleeper class non AC, Rs.1099 in III AC, Rs.1565 in II AC Rs 2640 I AC
FORMATION: Loco +SLR+UR+UR+S1-S12+B1-B3+A1+A2+HA1+UR+SLR – Actual coach formation of KK express
DISTANCE: KM 739:
No of Seats/Berths
2 or 3 GS on either end of the train 72 seats only
13/14 SL coaches (72 berths) ,
1 First AC (2 coupe 2 berths each & 4 cabins 4 berths each total 20 berths),
1 or 2 II AC(48 berths), 3 or 5 III AC (72) 


distance: 739 km    Unreserved General Fare: https://st.indiarailinfo.com/images/6pxRs.svg.png 219
Regular Ticket (12 and above)
Sleeper
AC 3-tier
AC 2-tier
AC 1st Class
Base Fare
365
962
1395
2379
Catering Charges
-
-
-
-
Reservation Charges
20
40
50
60
Superfast Charges
30
45
45
75
Other Charges
-
-
-
-
Concession
-
-
-
-
GST 5% **new
-
52
75
126
Net Fare
415
1099
1565
2640
Tatkal Surcharge
~116
~303
~440
-
Child Ticket (5 - 11)
Sleeper
AC 3-tier
AC 2-tier
AC 1st Class
Base Fare
365
962
1395
2379
Catering Charges
-
-
-
-
Reservation Charges
-
-
-
-
Superfast Charges
30
45
45
75
Other Charges
-
-
-
-
Concession
-183
-481
-698
-1190
GST 5% **new
-
26
37
63
Net Fare
212
552
779
1327
Tatkal Surcharge
~58
~152
~221
-


Regular Adult Fare for children 5 - 11 years IF FULL SEPARATE BERTH is required.

Children 0 - 5 years travel free. No separate berth provided.

Tatkal Surcharge extra for bookings in Tatkal Quota.

Sr. Citizen Concessions do not apply for Tatkal quota bookings.

Final Fare may be rounded up to the next 5 multiple.
Sleeper
AC 3-tier
AC 2-tier
AC 1st Class
Base Fare
365
962
1395
2379
Catering Charges
-
-
-
-
Reservation Charges
20
40
50
60
Superfast Charges
30
45
45
75
Other Charges
-
-
-
-
Concession
-183
-481
-698
-1190
GST 5% **new
-
28
40
66
Net Fare
232
594
832
1390
Tatkal Surcharge
~58
~152
~221
-
Sr. Citizen Female (58 and above)
Sr. Citizen Male (60 and above)
Sleeper
AC 3-tier
AC 2-tier
AC 1st Class
Base Fare
365
962
1395
2379
Catering Charges
-
-
-
-
Reservation Charges
20
40
50
60
Superfast Charges
30
45
45
75
Other Charges
-
-
-
-
Concession
-146
-385
-558
-952
GST 5% **new
-
33
47
78
Net Fare
269
695
979
1640
Tatkal Surcharge
~69
~183
~265
-

Train Costing: Introduction Of New Trains Argumentation/Cancellation Stopping.

Train Costing: Introduction Of New Trains
Argumentation/Cancellation Stopping.
  1. Direct Cost: Indirect Cost, Over heads, Central charges, Deduction to goods Trains.

                                                                                           Depreciation
      Direct cost: 1:LOCO                                                   Interest
                                                                                           Repair & Maintenance
                                                                                           Fuel, Crew
      Requirement of LOCOs
      Total hours require for re of the train
Total working of loco          6 hours * ½ attaching + ½ detaching

Per day 10 hours        7 hours required out of 20 hours = 7 hours
                                 7/20 x100= 35 % of required
                                 Add ½   5 % as spare capacity   125x10/35

Depreciation straight line method
Annual Depreciation=Present cost of asset-scrap value/life of asset =B%
B % of A = Annual Depreciation

b).Interest   Present day cost x requirement of LOCO x 7%

c). Repairs Maintenance = Abstract c 500
     Total expenditure of 2 under abstract 1500/ total no of Electric loco over zone

Over cost of repair & maintenance of LOCOs
      It is converted to requirement of ratio
d).Fuel: Specific Fuel from statistical branch consumption x GTKM of train will give actual requirement s of fuel to run the train annually

This x cost fuel = Cost of Fuel per

Crew                        1 Driver   1 Asst. Drawn Pay + DA+ TR etc + 30% running allowance
                                    20% of cost drawn x 12  annual cost of crew.+ cost of Asst+ requirement  10hours but asked for 7 hours  7/10 x 100 = 70%
 


 2 Coaches i) Depreciation
                  ii).Interest                   as composition is not disturbed requirement of coaches taken as fuel + 10% spares coaches present pay cost of coaches – class wise 
                  iii).Repair & maintenance:    Ac             Non Ac
                                       Figure obtained from coaches.

3). Generator Car: (Only in some train)
                                 Fuel                SFC
                                 Lubricant    
                                 Staff
Train costing:
4) Cost of Train examination L Enroute)
Places/ No. of train examination points arrived assume train stop for 10 minutes
 


Staff = 1+XR      1ELc          Annual Pay
             2 KH       2 KH  
Cost to be assumed

Indirect cost
Unit cost:
1. cost of track (P.Way) on GTKM- Unit cost per 1000 GTKM available in coaching unit cost and multiplied by  GTKM.
2. Cost of Signal:  Based on Engine KM (Distance in time table)
                                 Unit cost per EKM x this EKM
3. Cost of transportation: SM, Guard, Pointman etc
                                 Based on the cost of Train KM
  1. Cost of OHE: Unit cost of OHE x Total distance of Electrification
  2. Terminal Expresses: Based on No of Passenger originated per class.

Unit cost of   Booking
Ticket Checking                     Seat Capacity of each class x No of days of service annually
Enquiry & /Reservation
Special Services

Total Unit cost
Direct + Indirect
      Add overloads + Central charges
Total cost to run a train + total cost of detention to goods train
10 % of total expenditure for Rajadhani & Shadabti
2 % of total expenditure for Mail & Express train
Nil % of total expenditure for ordinary train
Actual final Total/ 365 = cost for trip