NEW BG LINE PROJECT


FINANCIAL JUSTIFICATION
NIDAMANGALAM – PATTUKOTTAI via MANNARGUID
FOR A NEW BG LINE

Introduction:
Nidamangalam is an existing intermediate (IMS) station on the Thanjavur – Thiruvarur section. Patttukkotai is also an existing IMS on the Thiruvarur – Tiruthuraipundi – Karaikudi section. Both the stations are under the jurisdiction of Thiruchchirappalli Divison.

Need:
There has been popular demand for connecting Mannargudi to the existing Nidamangalam and Pattukkottai. In fact a MG branch line existed between Nidamangalam and Mannargudi till 1975. due to popular demand and members from Parliament and the state legislature, ministry of railways has sanctioned  New Survey during 2007-08.
Proposed stations:
Rajappayyanchavadi, Haridranadi, Mannargudi, Serangulam, Paravakkottai and Madukkur.  The road distance is 48 KMs and the rail distance is 54.30 KMs.  There are four crossing stations and two halt stations.

Gauge:
It is proposed to be a BG line
Permanent Way:
52 KG Class I rail on PSC sleepers with M+7 density on Ballast cushion of 250 mm  for the mainline and 52 KG Class II rail on PSC sleepers with M+4 density on Ballast cushion of 200 mm  for loop and other lines.
Signaling:
The signaling arrangements will be Standard II MACL Panel Interlocking and mode of traction is Diesel.
Curvature:
The maximum degree of curvature will be 4 °. All curves are transitioned for the Maximum Permissible Speed of 100 KMPH. The proposed ruling gradient is 1 in 200 © duly compensated.
Bridges:
There are seven major 103 minor bridges. There are four ROBs and 35 RUBs and no level crossings are proposed.
Earnings:
Passenger earnings per year are estimated at  41.210 Lakhs and  55.074 Lakhs for local and interchanged passengers.
Freight:
Nidamangalm is an existing rail head generating paddy traffic for the TNCSC. Paddy, coconut, groundnut are grown in abundance for outward traffic and rice, grains, pulses, fertilizer, cement and wheat for inward traffic.  Further, M/s Pamani Fertilizer is the only industry in the area. The estimated annual outward and inward fright earnings are  2092.474 Lakhs and  4568.081 Lakhs. Net annual earnings anticipated are  2175.263
Investment on Rolling Stock  7944.700 Lakhs
Civil engineering                   23366.829 Lakhs             
Signal and Telecommunication  2325.246 Lakhs
Electrical (General)                  1459.890 Lakhs

The internal rate of return works out to 4.586 %

Consideration:
1.       Mannargudi is one of the important pilgrim centers of the ITDC, Lord Rajagopalaswany temple is located here. It is also known as Dhakshina Dwaraka, Mannai or Raja Mannargudi.
2.       socio- economic uplifting of the people can be achieved due to the changed scenario. Trade and industry of the area also has developed.

PROJECT APPRAISAL

with due acknowledgement to Shri Nagarajan Sr SO/CN/MAS

Project Appraisal

1)      Introduction:

i)        Project appraisals are highly necessary at the present financial position of IR where resources are becoming scarce and demand from various sections of the society are more.

ii)      Any commercial undertaking will attempt project evaluation methods to budget their capital expenditure for the following:
(a)    Expansion of operation
(b)   Diversification of operations
(c)    Replacement/Renewals
(d)   Research and Development

2)      Need for project appraisal:

i)        Involvement of large sums of money
ii)      Involvement of greater amount of risk on account of unforeseen situations
iii)    Irreversibility once investment Decision is made
iv)    Appraisals facilitate the identification of relatively superior proposals.

3)      Project report:

i)        Project report not only projects financial data related to outflows and inflows but also a meticulous traffic survey exercise for a New line, GC and Doubling/Augmentation of line capacity works to enhance the rly working
ii)      Traffic potential, existing and anticipated
iii)    Traffic Density present and future volumes
iv)    Technical feasibility
v)      Financial viability

4)      Definition

i)        Detailed study of traffic conditions of an area
ii)      Assessment of Traffic prospects
iii)    Financial implication

5)      Objective of Traffic survey

i)        Estimate of total traffic likely to be generated in the foreseeable future with special reference to the catchments area
ii)      Inter-0model allocation of total streams of Traffic between rail and other modes of Transport
iii)    Computation of earnings and working expenses for each year of the economic life of the project which is taken as 30 years
iv)    Appraisal based on annual cash flows and application of Discounted cash flow method (DCF)
v)      Minimum yield of rate of return of 10%



6)      Filed work

i)        Fixing of most suitable alignment for the proposed rail line in close collaboration with Engineering team
ii)      Collection of data from various sources like local bodies, prominent citizens, business community, Transport authorities, Industrialists, chamber of commerce of the alignment region and catchment areas.

7)      Data to be collected

i)        No. of bus trips (from Transport sector), plying on the alignment and its catchment area, occupancy, running time, fare structure and other road vehicles
ii)      Bus traffic during festival days and national Holidays
iii)    Assessment of passenger preference for Rail mode
iv)    Tourism and tourist prospects
v)      Local area profile from Panchayat/Municipal bodies
vi)    Educational institutions, banking and hospital facilities
vii)  Agricultural/mineral resources generated from the alignment section
viii)            Existing industrial scenario and anticipated development of industries on the alignment and catchment area
ix)    Plans for economic development of the area by the local/central Govt.            

8)      Estimate of passenger traffic & earnings

i)        Diversion from road to rail mode based on existing trends and pattern
ii)      Propensity of the traveling public for rail mode due to competitive rail fare
iii)    Travel time, comfort and safety
iv)    Travel pattern based on importance of places of travel
v)      Travel pattern based on importance of places of travel
vi)    Earnings at current rail tariff level

9)      Estimate of freight traffic and earnings

i)        Existing goods traffic pattern both inwards and outwards on the alignment region
ii)      Requirement of specific commodities for specific needs
iii)    Trading & commercial centers on the alignment
iv)    Industries on the alignment
v)      Incremental traffic from existing rail goods shed due to increasing trend in traffic volumes over years
vi)    Addl. new goods traffic for existing/coming up industries
vii)  Addl. Traffic  in foreseeable future as diversion from existing road net work
viii)            Mineral wealth and additional traffic from mines if any
ix)    Port development, if any, on the alignment region
x)      Rail transport clearance from Railway Board
xi)    Earnings estimated from origination to destination point of movement of goods tfc. Using latest freight tariff



10)  Passenger traffic Working expenses

i)        Based on the traffic assessed running of passenger/express trains are determined for rake composition, trips
ii)      A check list is prepared to arrive at facets like train km, vehicle km, vehicle days and gross tonne km
iii)    Based on the checklist and applying the various cost elements from unit cost, working expenses is worked out.  General OH charges, central charges are added to the working as a percentage.  The total working expenses is further escalated to the present level by applying escalation factor given by the Board

11)  Assessment of goods traffic working expenses

i)        Terminal services cost
(a)    Cost of documentation and cost of other terminal expenses per wagon (in terms of units)
(b)   Cost of marshalling per wagon per yard handled (in terms of units
(c)    Cost of provision and maintenance of carrying units per wagon day(based on wagon turn round)
ii)      Line haul services cost
(a)    Cost of traction per 1000GTKM (depending on traction)
(b)   Cost of other transportation services including cost for train passing staff per 1000 GTKM
(c)    Cost of provision and maintenance of track & signaling per 1000GTKM
iii)    After computing total working expenses, general OH and central charges as a % of cost is added
iv)    78.5% of operations and maintenance and cost over existing rail system is also added to the project working expenses
v)      The total cost of working expenses is escalated to the current level of survey with escalation factor furnished by the board.

12)  Estimate of net earnings

i)        Gross working expenses arrived both for coaching and goods traffic assessed is deducted from gross earning to compute net earnings

13)  Assessment of Rolling stock and investment

i)        Requirement of rolling stock like coaches, VPUs and locos for running the proposed passenger/express trains is assessed utilizing train km., trips/rakes,

ii)      Rly. Bd. Statistical elements pertaining to Zonal Rly is made use of.  The current cost of rolling stock from Pink Book (Rolling stock Programme) is used for working out investment.
iii)    Requirement of Rolling stock like wagons and locos for running the proposed goods tfc. is assessed utilizing net tonne km., train km., Engine km., and engine usage.  Railway Board statistical elements pertaining to Zonal Rly is made use of the current cost of rolling stock from Pink Book (Rolling stock programme) is used for working out investment.


14)  Savings

i)        On GC Surveys, in addition to addl. tfc. Assessed, savings in the different operational & maintenance cost between MG & BG systems is to be reckoned
ii)      Savings due to avoidance of transshipment cost on GC works also computed
iii)    Savings in operations cost due to shorter lead of the project section, if any will also be credited duly debiting the loss in earnings if any
iv)    Savings on engine hours and wagon hours due to elimination of detention enroute on single line section is also reckoned while working out financial appraisals for Dlg/Augmentation surveys.

15)  Engineering estimate

i)        Engineering estimate includes civil, signal telecommunication and electrical (g) , OHE cost, wherever proposed is also debited.
ii)      Credit on released railway material is credited wherever applicable

16)  Terminal value of assets

i)        The life of any rail project is reckoned as 30 years for financial appraisal purpose.  The value of physical assets of different categories outliving the project life of 30 years is also computed and credited at appropriate years.  Replacement cost for the assets which expires before the life of the project is debited at appropriate years.

17)  Financial appraisal

i)        Fin. Appraisal on Rly. Projects are undertaken using the DCF method
ii)      This method is more scientific since it takes into account the real time value of money
iii)    It also takes into a/c realistic earnings, cash expenditure and accurable savings
iv)    IRR is done under DCF technique which gives max. ROR possible from a project a given cash flow wherein the rate of discount is located by interpolation for bringing NPV (Net present value) = Zero


*******

Wednesday, March 28, 2012

UNIT COST OF NEW LINES etc


THE LATEST UNIT COST PER KILOMETER AS ON 31/03/2011
  • NEW LINES                                 5.00 Crores
  • GAUGE CONVERSION             5.00 Crores
  • DOUBLING                                 6.00 Crores
  • PET (Preliminary Enginerring-cum-
  • Traffic Survey                              35 Thousands
  • Updating PET                               15  Thousands
  • FLS Final Location Survey         1Lakhs or 2 % of Total sanctioned Estimate
  • Preliminary Expenses                 5 Lakhs         
  • Electrification - Route KM        55 Lakhs
  • Electrification - Track KM        75 Lakhs
for further clarification please contact Rly Phone 27496 CN/MS; 
27114 RE/MS

Monday, March 19, 2012

Wednesday, February 29, 2012

Monday, February 27, 2012

FUNCTIONS OF DIVISIONAL ACCOUNTANTS





 FUNCTIONS OF D IVISIONALACCOUNTANT


q  as an accountant he should check arithmetical accuracy of all vouchers fully and compile the accounts of the divn in accordance with the prescribed rules and form the data supplied to him by the sub divns
q  As representative of A/c dept he should apply all the checks which is normally applied in the A/c office to the initial a/cs vouchers and other documents
q  As financial assistant,  he should assist the executive in matters relating to a/c s , budget estimates and to the operation of  financial rules generally
q   the relation between the DEN and D A is that of a Sub divisional officer and the DEN. The DEN is supposed to consult the DA in all matters involving a/cs,. Finance or budget. The DEN should see that the DA is given fullest opportunity of becoming conversant with all sanctions and orders, estimates and proposals. 

The DA is considered as the head of the office establishment of the DEN. While checking accounts and returns whenever the DA finds any irregularity, he should bring to the notice of DEN. 

If DEN differs from the views of DA he records his orders and the same should be carried out. In such cases DA should maintain a register as DA’s Internal Check Register and enter the same with full details in the register and obtain the remarks of DEN therein. This register is put up to any visiting officer for information

The DA should not however, be made responsible for any cash transaction except emergent cases not exceeding four months.
The DA should maintain cordial relationship not only with DEN but also with all other sub divisional officers and also educate the office staff and subordinates about proper maintenance of records, submission of accounts returns, preparation of budget etc

In the open line divisions also a SO (Works) is posted under the DEN designated as Works Accountant. The functions are the same as DA. However, he is not considered as he head of divisional works branch but will be the head of works accounts section. 

The DA is considered as the head of the office establishment of the DEN. While checking accounts and returns whenever the DA finds any irregularity, he should bring to the notice of DEN. If DEN differs from the views of DA he records his orders and the same should be carried out. In such cases DA should maintain a register as DA’s Internal Check Register and enter the same with full details in the register and obtain the remarks of DEN therein. This register is put up to any visiting officer for information

The DA should not however, be made responsible for any cash transaction except emergent cases not exceeding four months.
The DA should maintain cordial relationship not only with DEN but also with all other sub divisional officers and also educate the office staff and subordinates about proper maintenance of records, submission of accounts returns, preparation of budget etc

In the open line divisions also a SO ( Works) is posted under the DEN designated as Works Accountant. The functions are the same as DA. However, he is not considered as he head of divisional works branch  but will be the head of works accounts section.